logo
  • English
Home Cases

KALUDRA 700KW Hydropower Project 2011 Serbia

Certification
China Hangzhou Hydrotu Engineering Co.,Ltd. certification
China Hangzhou Hydrotu Engineering Co.,Ltd. certification
Customer Reviews

—— Business License

Hydrotu has performed all the responsibilities.Water turbine and generator set operates safely and steadily with lower noisy and good quality.

—— HUlUSI SITKI -Turkey

The turbine bought from hydrotu in 2010, it operates steadily, continuous working without faults, has perfect after-sale service.

—— Dragan Klisura-Serbia

I'm Online Chat Now

KALUDRA 700KW Hydropower Project 2011 Serbia

July 11, 2011
Latest company case about KALUDRA 700KW Hydropower Project 2011 Serbia

Technical Specifications and Main Parameters of KALUDRA HES 1X700KW Hydropower Plant

Basic Parameter technical specification
Model Horizontal shaft Turgo turbine,XJE-W-Z60B/1X9.5
Rated water head H=204.5m
Rated Discharge Q=0.43m3/s
Rated Output power P=1x737KW
Rated efficiency: η=85.5%
Rated speed: n=1000 rpm
Runner diameter D1=55cm
Runner material: Stainless steel (0Cr13Ni4Mo)
Rotary direction Clockwise viewed from generator to turbine

 

latest company case about KALUDRA 700KW Hydropower Project 2011 Serbia  0

latest company case about KALUDRA 700KW Hydropower Project 2011 Serbia  1

latest company case about KALUDRA 700KW Hydropower Project 2011 Serbia  2

latest company case about KALUDRA 700KW Hydropower Project 2011 Serbia  3

latest company case about KALUDRA 700KW Hydropower Project 2011 Serbia  4

latest company case about KALUDRA 700KW Hydropower Project 2011 Serbia  5

Contact Details
Hangzhou Hydrotu Engineering Co.,Ltd.

Contact Person: Mr. Tu mingqi

Tel: +86 13003602610

Fax: +86-571-85194290

Send your inquiry directly to us (0 / 3000)